§ 13.04.080. Connections—Expense responsibility—Approval required.  


Latest version.
  • A.

    All connections to the city water and sewer system shall be made at the expense of the owner of the premises and payable in advance to such connection.

    B.

    All customer service lines shall remain the responsibility of the owner of the premises, including but not limited to, the cost of repair, modification, frozen lines, water leaks, disconnection or reconnection.

    C.

    All modifications, repairs, disconnections and reconnections shall be made after the approval of the public works director with concurrence by the city manager, and shall comply with the service connection specifications. Service connection specifications shall be on file at the office of the public works department.

(Ord. 01-1 § 2 (part), 2000: Ord. 86-8 § 1 (part), 1986).