Dedication for Major Subdivisions. All streets, facilities and improvements shall
be expressly dedicated to public use at the time of the filing of the final plat and
in compliance with KMC §18.20.030.
(b)
Easements for Major Subdivisions. Easements for sewers, water mains, electric lines
or other public utilities shall be dedicated wherever necessary. The easements shall
be at least twenty (20) feet wide and, where applicable, centered on rear or side
lot lines with ten (10) feet of the easement on each side of the rear or side lot
lines. No permanent structures or improvements shall be built in the easements. Non
permanent structures and/or non-permanent improvements built in easements are subject
to removal, as needed for use of or access to the easement, at the sole expense of
the property owner. The City shall not be responsible or liable for the costs(s) of
reconstructing or replacing any such non-permanent structures or nonpermanent improvements
that require removal in order to facilitate the use of, or access to, the easement.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');