§ 15.08.010. Code adopted by reference. |
§ 15.08.020. Copies on file. |
§ 15.08.030. Scope of code. |
§ 15.08.040. Section 5.4.9 added—House sewer cleanout. |
§ 15.08.050. Section 10.6.1 amended—Watersewer pipe separation. |
§ 15.08.060. Section C.9 added—Ethylene glycol system separation. |
§ 15.08.070. Permit—Required—Holder's responsibility. |
§ 15.08.080. Permit—Application—Fees. |
§ 15.08.090. Permit—Term. |
§ 15.08.100. Permit—Plan and specification approval. |
§ 15.08.110. Permit—Not required when. |
§ 15.08.120. Right of entry for inspection. |
§ 15.08.130. Stop-work orders. |
§ 15.08.140. Water piping tests. |
§ 15.08.150. Air-conditioning and water-operated devices. |
§ 15.08.160. Sewer connections or interference. |
§ 15.08.170. Connection to proximate sewer. |
§ 15.08.180. Enforcement—Administrative authority designated. |
§ 15.08.190. Violation—Penalty. |